AT&F Blog

Press Brake Formed Girder Systems at AT&F

The American Society of Civil Engineers (ASCE) estimates that over 9% of short span bridges in America are structurally deficient (requiring yearly inspection and maintenance) and that over 188 million trips take place across these bridges every day. Replacing these problematic bridges has become a national priority for meeting infrastructure goals. The challenge rests in providing a cost-effective structural solution while minimizing traffic diversions by reducing bridge construction times.

BIG with Press Brake Formed Steel Tub Girder Technology

First Bridge in the U.S. to be designed with new press brake-formed tub girder technology Ribbon Cutting Ceremony

1